Suitable substrates
Sound, rigid, dry and stable bases are required. Concrete, screeds and some existing tile may be suitable after assessment; flexible, damp or poorly bonded substrates need correction first.
A seamless floor can carry one surface through an entire level. Its long-term appearance is decided largely by the substrate and the preparation beneath it, not by the finish alone.
What to consider
Sound, rigid, dry and stable bases are required. Concrete, screeds and some existing tile may be suitable after assessment; flexible, damp or poorly bonded substrates need correction first.
Structural and movement joints in the building must be respected in the finished floor. They cannot simply be covered over and should be planned into the design.
A thin finish follows the base beneath it. Cracks or movement in the substrate can reappear at the surface, so repairs and reinforcement are evaluated before application.
Wear depends on traffic, the selected system and the protective sealer. Furniture pads, appropriate cleaners and periodic maintenance help; no surface is immune to scratching or impact.
Heating may be considered only over a rigid cementitious substrate and after review against manufacturer guidance, including gradual commissioning. Compatibility is never assumed. Electrical work in Ontario requires a licensed electrical contractor.
Microcement does not replace structural repair, levelling or moisture control. These are addressed first so the finish has a stable foundation.
Planning checklist
These details help us evaluate the enquiry. Final suitability is confirmed through site assessment and manufacturer documentation.
Next step
Share the space, the existing floor and any heating plans. We will review the details and advise on next steps.